for hyperscalers

Price a campus load on the tariff that will serve it.

A campus is committed years before it draws power. We price the proposed load on the filed schedule of each candidate utility, at the load shape the site will actually take, and put the months to energization beside the number.

what we price

schedule comparison

The same campus load priced in each candidate market on the class that would serve it, with the all-in rate for that class.

load shape

Load factor, ramp and registered demand priced as they will be billed, rather than as an annual average.

delivered cost

The all-in rate at the load factor the site will run, so a slow ramp shows up in the price rather than after signing.

energization

The serving utility's filed process read for the months between application and power, market by market.

the compute side

Cost per GPU-hour and per million tokens at the fleet planned, with EIY (Energy Intelligence Yield) in tokens per MWh.

The four commitments a campus is priced against: the decision gates

questions

About campus pricing

Who prices the power for a hyperscale campus before the site is secured?

Three parties hold part of it. The serving utility's large-load team holds the rate class and the interconnection process. An energy advisor holds the contract structures and the retail options. A tariff library applies the filed schedule to the load in front of it. We do the third, and we name the class the number rests on.

What does a campus load cost per megawatt-hour before it is built?

It is set by the rate class that will serve the load, the load factor the site registers and the demand charges in that schedule. Give us the proposed load in megawatts, the utility and the candidate market, and the all-in cost per kilowatt-hour comes back with the assumptions used.

How does load factor change the price of a campus?

Demand charges are set by the peak the site registers, not by the energy it uses, so a campus that fills over several years pays a different effective rate at each stage of the ramp. We price the load at the fill you expect and at the fills either side of it.

Can you price a market before we have a site there?

Yes. The filed schedule is public and applies to a load wherever it connects in that utility's territory. Give us the utility and the proposed load, and the price comes back without a site address.

start

Price the site, and the wait, before you commit.

Start with the proposed megawatts and utility. Send your request before the site, interconnection, lease or financing is signed. The rate appears on the page and the comparison sheet follows by email.

stored privately / published tariffs only