Price the power behind the GPUs you sell by the hour.
Revenue is quoted per GPU-hour or per million tokens, while the power is committed per kilowatt-month. We price one against the other before the lease or the commitment is signed.
colo quote check
A quoted power commitment read against the fleet you plan to host: effective cost per kilowatt-hour, cost at each fill level, and dollars per million tokens.
fill sensitivity
The same commitment priced at partial and full fill, so a lease signed ahead of demand shows the cost of that timing.
yield
EIY (Energy Intelligence Yield) for the fleet in tokens per MWh, reported beside cost per GPU-hour and per million tokens.
site price
A build of your own priced on the serving utility's filed schedule, before the interconnection application or the land.
capacity
Planned power that runs past the quoted commitment identified before the signature.
Have a colo quote in hand? check it
About colo commitments
How do I check whether the power in a colo quote is priced well?
Take the quoted rate per kilowatt-month, the committed kilowatts, the GPU you plan to run and the fill you expect. That yields the effective cost per kilowatt-hour, the cost per GPU-hour and the dollars per million tokens, which is the number your own customer compares against. The quotable rate on its own does not answer it.
What does power cost per GPU-hour in a colo lease?
It comes from the committed kilowatts divided across the fleet, the rate per kilowatt-month and the cooling overhead the hall carries. A hall priced at a low rate with a high committed load and slow fill can cost more per GPU-hour than a higher rate with the load you will use.
What happens to margin if the hall fills slowly?
The commitment is billed whether or not the GPUs are installed, so the effective cost per GPU-hour rises until the fleet reaches the load. We price the same commitment at the fills on the way up, and report what each stage costs against the tokens you can sell.
Why report EIY (Energy Intelligence Yield) next to the price?
Because the power bill is only half of the margin. EIY (Energy Intelligence Yield) puts the tokens a fleet returns per megawatt-hour next to what the megawatt-hour costs, so two halls with the same rate can be compared on the compute they produce.
Price the site, and the wait, before you commit.
Start with the proposed megawatts and utility. Send your request before the site, interconnection, lease or financing is signed. The rate appears on the page and the comparison sheet follows by email.
stored privately / published tariffs only