for neolabs

Put a price on the power under a research budget.

Training runs draw in bursts that a flat power commitment prices as if they were constant. We price the commitment against the compute you plan to run, and put the electricity cost of each million tokens beside it.

what we price

quoted power

The power in a lease or a partner offer priced per kilowatt-hour, per GPU-hour and per million tokens, with the assumptions stated.

run shape

The fleet at the fill a research schedule produces, so the cost of idle committed capacity is visible before the term starts.

site or partner

A site of your own priced on the filed tariff, or a partner hall checked against the fleet it will hold.

yield

EIY (Energy Intelligence Yield) in tokens per MWh, reported with the inputs behind it.

timing

The months the serving utility's filed process takes, set against the quarter the next run is planned for.

The metric used for the compute side: EIY (Energy Intelligence Yield)

questions

About research commitments

How much does electricity cost per million tokens for a research cluster?

It is the power the fleet draws per hour, at the rate you pay for it, divided by the tokens the workload returns in that hour. Give us the GPU, its power draw, the throughput you measure on the run and the power rate, and the cost per million tokens comes back with each input listed.

What is a sensible power commitment for a lab that runs in bursts?

One sized to the sustained draw between runs rather than to the peak of a single training job, unless the site can shed the difference. We price the commitment at the fill a burst schedule produces, so the cost of capacity held between runs appears in the number.

How do we compare two colo offers for a training cluster?

Price each on the same fleet, the same fill and the same workload, then read the cost per GPU-hour and per million tokens rather than the quoted rate. Both offers are then measured on what the power produces as well as what it costs.

Can the power for a site we build ourselves be priced?

Yes. The filed schedule of the serving utility applies to the proposed load, so the all-in rate can be priced before the interconnection application is filed.

start

Price the site, and the wait, before you commit.

Start with the proposed megawatts and utility. Send your request before the site, interconnection, lease or financing is signed. The rate appears on the page and the comparison sheet follows by email.

stored privately / published tariffs only